Services
What we're doing
- Bear River Bridge explosions! http://t.co/R8V17FCG about 4 months ago from web
- Watch a 250' chimney collapse into itself and a bridge fall - http://t.co/0cxBEGG about 5 months ago from web
- Completed the blasting for the Five Islands Road. about 6 months ago from HootSuite
- Starting demolition of the Sissibo River railway bridge in August with the Bear River bridge to follow. about 6 months ago from HootSuite
- Currently installing micro piles at the Pugwash Salt Mine. It's the only salt mine and, at present, the only underground mine in NS. about 6 months ago from HootSuite

Custom Drilling
Innovative Drilling designs systems for unusual drilling needs. The company can take existing machinery and adapt it to fulfil specific requirements.
A slim top section of Second Falls Dam in Edmundston, New Brunswick, needed remedial pressure grouting. Innovative Drilling came up with a creative solution to drill at this limited access site. The company wheeled in a drill mast and pinned it to a hinged template. The drill mast was then winched vertically to operate on top of the dam.
Drilling at Second Falls Dam in Edmundston, New Brunswick.
Innovative Drilling worked from a cliff side to stabilize a rock face at Fundy Gypsum.
Case study – The base of the aging Little River Wharf was spreading – partially because the sea floor surrounding the wharf had been dredged. For this project, Innovative Drilling created a customized drill rig. They drilled casings horizontally through the wharf at low tide level. The company then installed tie rods that halted base spread and extended the wharf’s life. Innovative Drilling effectively “sewed” the wharf together.
Workers prepared to drill 40 foot casings through the wharf with a custom built horizontal drill.